loader image

Grid-tied Systems

Context

Key Constraints In Designing A Solar Grid-Tied System

When planning a solar grid-tied system, we consider four main factors: 

In some cases, businesses tend to prefer that some other party invests in the solar infrastructure. The savings on electricity costs are shared between the two, and this model is now picking up. Gram Oorja also facilitates such arrangements.

Factors In Designing A Grid-tied System:

Thorough Bill Analysis
Structural Analysis (If Required)
Shadow Analysis
Thorough Bill Analysis
Structural Analysis (If Required)
Shadow Analysis
Three-dimensional Models To Optimise Usage Of Available Area
Three-dimensional Models To Optimise Usage Of Available Area
Simulation Using Radiation Data To Predict Generation
Customized Module Mounting Solutions
Simulation Using Radiation Data To Predict Generation
Customized Module Mounting Solutions
Appropriately Sized AC And DC Cables To Ensure Minimum Losses
Clean Installation With Optimised DC Strings
Premium Quality Modules And Robust Installation
Appropriately Sized AC And DC Cables To Ensure Minimum Losses
Clean Installation With Optimised DC Strings
Premium Quality Modules And Robust Installation
Walkways And Handrails For Improved Safety And Longevity Of The Tin Roof
Walkways And Handrails For Improved Safety And Longevity Of The Tin Roof
Module Cleaning System
Online Monitoring And Bill Verification
Module Cleaning System
Online Monitoring And Bill Verification
0 +

Total Projects

0 +

Installed Capacity (in MWp)

> 0

Average Payback (in Years)