Car showroom in Latur, MH

Grid Tied Solar System
92 kWp installed
Commissioned: October 2023
- Annual estimated energy generation of 129 MWh (Based on current total generation of 26.91 MWh in 3 months of operation)
- Simple payback in 2.2 years
The biogas plant built at the Keshav Srushti Goshala in Bhayandar, Thane provides around 40-50 cubic meters of biogas daily to cook breakfast and lunch for 600 students at their schools’ canteen. The plant, located roughly 750 meters from the school canteen, is connected via pipeline. The biogas plant has significantly reduced spending on LPG as it has been saving 2 commercial LPG cylinders per day for the organization since 2015.

Technical Specifications:
- Solar module - 160 nos - 545 Wp Mono perc half cut (Renewsys)
- Inverter - 2 nos - 50 kW (Sungrow)
- MMS - Aluminum rails on industrial shed
- Protections - ESE certified lightning arrestor, Surge protection, MCCB, String fuses
Key Technical Aspects
- Detailed technical survey & activities like structural analysis of the shed, soil resistivity test, Lightning Arrestor (LA) design
- Design for efficient use of available space to gain optimum generation
- Paramount importance given to Industrial safety
- Online monitoring of generation data
- Ensuring the highest installation standards
- Long term value delivered to the customer using high quality material
Economical Aspects
- Biogas Plant - Digester covered with balloon
- Capacity - 80 mɜ
- Feed - 2 ton of cattle manure
- Distribution Line - 750 m
- Use - Cooking at hostel canteen, replacing LPG to some extent
Type of charges | Amount | Unit |
---|---|---|
Energy Charges | 12.76 | Rs/kWh |
Wheeling Charges | 1.35 | Rs/kWh |
Fuel Adjustment Charges | 2.55 | Rs/kWh |
Tax On Sale | 0.194 | Rs/kWh |
Electricity Duty @ 21% | 3.53934 | Rs/kWh |
Cost Of Electricity | 20.39 | Rs/kWh |